Stepped Water Jacket Verification — Calibrated Cyl 1SF11904
49 CFR §180.215 (±1.0% Tolerance)Type each burette reading and press Enter—your cursor advances automatically down the pressure ladder.
Verified Calibrations on Selected Date
| Time (EST) | Jacket | Step PSI | Chart (A) | Burette (B) | Perm | % Deviation | Sign-Off | Status |
|---|
Step A — Multi-Angle AI Bottle & Valve Tag Scanner
Reads Stamps • Valve Tag # • OD × LengthStep B — Verify Cylinder Details & Physical Size Before Queuing
Manual / Ready for AI Scan🏷️ Quick Valve Tag Assignment (Match Reusable Tag # to Serial #)
Live Intake Queue (Waiting for Test Stand)
| Customer | Serial # | Active Tag # | Spec & PSI | OD × Length | Test PSI | Action |
|---|
Active Cylinder on Hydrostatic Test Stand
Completed Cylinders on Selected Date
| Owner | Serial # | Active Valve Tag | Size | Spec | Test PSI | Total | Perm | Elastic | % Perm | Disp |
|---|
🏷️ Active Valve Tags Currently Out on Bench (Reusable Tags)
Reinstalling Releases Tag # for Next Day's Cylinders| Active Tag # | Belongs to Serial # | Customer | Size / Spec | Test Status | Release / Reinstall |
|---|
Lookup Work History By Date
| Work Date | Clients | Done / Total | Inspect |
|---|
Categorized By Customer
| Customer | Bottles | Unbilled | Last Date | View |
|---|
Master Cylinder Lookup (Customer, Serial #, Date, or Active Valve Tag #)
| Date | Sheet # | Owner | Serial # | Active Tag | Size | Spec | Total / Perm | % Perm | Disp | Sign-Off |
|---|
1. Print Scope — Working Date:
All DOT Forms Signed Off Exclusively as Ryan Pearce (RP)2. Official DOT Recordkeeping & Bench PDFs
3. B386 Retest Laser Stickers (3×10 Sheet)
1. Build Customer Invoice From Completed Bottles
| Line Item Description | Qty | Unit Price ($) | Line Total |
|---|
Draft Total: $0.00
2. Saved Customer Invoices
| Invoice # | Customer | Service Date | Total | Status | Actions |
|---|
3. Master Service Rate Schedule
| Service Code | Description | Unit Price ($) |
|---|